2025 Project Update
Trails Council invested $15K in clearing 3.4 miles of the Arroyo Quemado Trail single-track trail in the Los Padres National Forest and a portion crossing county-owned property.
2024 Project Update
The long-awaited official grand opening for the Arroyo Quemado Trail occurred on February 16th, 2024. Costly repairs to the Loop Trail were completed in the fall of 2024. The kiosk structure was added in the spring. The habitat restoration project along the entryway to Baron Ranch required ongoing maintenance.
2023 Project Update
In the fall of 2023, a mile-long trail segment was added to the Baron Ranch trail network. Located between the pedestrian bridge and the first at-grade creek crossing, the new route allowed trail users to see a more expansive view of the canyon. At the same time, work was being done to repair the Loop Trail from damage inflicted by rain events earlier in the year and the previous winter. The habitat restoration project along the entryway to Baron Ranch required ongoing maintenance.
2022 Project Update
x
Baron Ranch Trail Map:
http://sbtrails.org/maps/brt/baron-ranch-trail-map-2021.pdf
Project History
Location:
County of Santa Barbara | Gaviota, CA
Description:
Baron Ranch Trail Design, Permitting and Construction: The Trails Council managed trail design, permitting, and environmental review for the construction of a 6-mile-long trail reaching from Highway 101 to the crest of the Santa Ynez Mountains on the Gaviota Coast. Our team—including our Trail Construction Manager, trail crew, Executive Director, and Board Members working alongside civil engineering and environmental consulting firms—surveyed the preliminary trail line and plotted coordinates for alignment. GIS-based maps were then prepared for the design of the Upper Baron Ridge Trail, a new 3.4-mile trail along a steep ridgeline from Baron Ranch, across the Land Trust’s Arroyo Hondo Preserve, ascending nearly 2,000 feet to the crest of the Santa Ynez Mountains and West Camino Cielo.
An environmental consultant completed a National Environmental Protection Act required Environmental Assessment and supporting biological and cultural resource studies, with all the necessary design, environmental documentation, and construction funded by the Trails Council through grants and private fundraising. Subsequently, the Trails Council designed the Lower Baron Ranch Trail, which involved relocating over 2 miles of existing trails from the east side of Quemado Creek to the west side, designing a 120-foot-long free-span bridge across the creek, and developing a new public trailhead parking area/horse trailer turnaround and entrance improvements within County ROW along Calle Real. The project was supported by close coordination with County Parks Department staff, a civil engineering firm for designing the new parking lot and creek bridge, and an environmental consulting firm to prepare the Initial Study/Mitigated Negative Declaration as required by the County under the California Environmental Quality Act.
Two hearings, including a Planning Commission hearing, saw public presentations, ensuring extensive coordination between the County Parks Division, the Department of Public Works, and the Office of the 3rd District Supervisor.
Client:
U.S. Forest Service & County of Santa Barbara | Community Services | Parks Division
Funding:
Trail planning was funded by grants to the Trails Council from Goleta Valley Land Trust, UCSB Associated Students, and WWW Foundation, along with funds from the County of Santa Barbara. Trail construction was funded by grants to the Trails Council from the National Forest Foundation, WWW Foundation, Sierra Club, community members, and funds from the County of Santa Barbara.
Contact:
Jill Van Wie, Capital Projects Manager
805-568-2470; jvanwie@co.santa-barbara.ca.us
John “Pancho” Smith, District Ranger, Santa Barbara District